Tips on Hand Designation & “Counter-flow”

Are your chilled water coils right hand or left hand?  Are you looking into the face of the coil with the air hitting you in the back of the head?  What exactly is counter-flow and why is it important?  Are you completely confused by why right hand vs. left hand even exists?  Most manufacturers probably do not know or understand the technical reasons themselves.

First, let’s figure out what coils even need a hand determination.  Chilled Water Coils, Direct Expansion (Evaporator) Coils, and Condenser Coils are the only coils that need this figured on almost every job.  Hot Water Coils, Booster Coils, and Steam Coils rarely need this determination!  The reason for this is when the coils are only 1 or 2 rows deep, they can be flipped over.  When a chilled water coil is 3+ rows deep, hand determination is much more important because it needs to be counter-flow.  With most suppliers determining hand designation with the air hitting you in the back of the head….do you want the connections on the right or left?

Chilled Water CoilsYou’ve probably heard the term “counter-flow” countless times, but here’s the simplest explanation.  For peak performance, you want the air and the fluid traveling in opposite directions through the coil.  Is it the end of the world if your coils are not counter-flow?  The short answer is no, but you will lose approximately 5% of the output.  So if your coils are piped incorrectly, don’t expect to get the full performance, but they will still be more effective than whatever you’re replacing.  Steam and hot water coils are 1 or 2 rows deep, so again, counter-flow is pretty much irrelevant.  However, it can make a difference with any chilled water or direct expansion coils (3-12) rows deep.

We also get asked many times “what is the proper way to pipe coils?”  Put simply, steam coils should always be fed on the highest connection and the return on the lowest connection.  Water coils should always be fed on the lowest connection and returned on the top connection to ensure that all of the tubes are are fed the same volume of fluid. 

Hand designation and counter-flow are two pretty simple concepts when they are properly explained.  When dealing with a HVAC coil manufacturer, partner up with one who will walk you through the engineering and explain it along the way.  Capital Coil & Air has well over a decade of experience in handling pretty much any scenario that you may come across, so we want to be your coil resource for any and all projects. Please give us a try on your next job!

RELATED POSTS

Why are HVAC Coils Copper Tube and Aluminum Fin?

Did You Know? Facts about Commercial HVAC Coils

You should never have to worry about performance on replacement coils…Well, almost never!

 


5 Work Day Quick-Ships on HVAC Coils – Why Capital Coil does it right

Day 1 – 38% of all orders sent to Capital Coil are on some kind of quick-ship, whether it be on a (5 day, 10 day, or 15 day). We enter the order immediately so that all departments in the plant have the project in their systems and are ready to move on it right away. The coil isQuick-Ships engineered, routing sheets are sent to the shop floor, and everybody now knows what needs to be built. 

Day 2 – Sheet metal casings are cut and sized, headers and connections are fabricated, while tube sheets are fabricated.

Day 3 – All tubing and fins are cut, stamped and assembly begins. You can see what the coil will look like upon final assembly at this point. Coils can be seen sitting on assembly tables.

Day 4 – Tubes are then expanded into the fins, and keep in mind that this is not a short process. Headers are then brazed to the tubes, and if there are return bends, they are connected. The coil is completely assembled and moved to the testing tank. The coil is tested under water for 20 minutes at 550 PSI. About 3% of coils have small leaks someplace in the brazing and are sent back to braze again.

Day 5 – The coil is crated and sent to shipping for routing to the customer. Then most importantly, your coil will be shipping in the guaranteed (5) days.

As you can see by this description, with quick-ships, there is not a lot of room for error in the timing and shipping with OEM HVAC replacement coils. We’ve been doing this for a while now, and we’ve had an approximately (97%) success rate fulfilling all quick-ship requests. We offer quick shipments 365 days per year, with both (10) day shipments & (15) day shipments also available for lower premiums.

diagram 

RELATED POSTS

Are Your Quick-Ships Shut Down When Needed Most???

How to make your HVAC OEM Replacement Coil Buying Process Easier??

OEM Replacement Coils: Repair or Replace???


Light-Duty Commercial Belt Drive Air Handler Units

There are lots of jobs that require large custom built Air Handler Units, as well as jobs that require Central Station Air Handler Units that are semi-custom built units. There are also plenty of jobs that Belt Driverequire neither of the above products. This application only requires that a light-duty standard unit be built that will match the duty and requirements of the job.

 Examples

  • Strip Malls/Shopping Centers
  • Dormitories and other college campus buildings
  • Military installations
  • Office areas in factories or other industrial settings
  • Condominiums

These examples do not need large heavy-duty units that are expensive and custom built. Instead, most of these units require standard light-duty construction that can provide 800-12,000 CFM. These units come with various options and choices, and are well-built with the highest quality components available. However, the units are not designed for overkill.

Capital Coil manufactures “Belt Drive” units that operate from 800 CFM (2 Tons) – 12,000 CFM (30 Tons). They are available in both horizontal and vertical airflow styles. Included are blowers, coils, drives, filters as well as additional accessories if required. Additionally, they are available in Chilled Water Coils, DX Coils, Hot Water Coils, and electric heat if needed.

So, why would you want to use these units in lieu of a heavy-duty air handler? Cost, cost, and cost again are the primary reasons. In addition, the light-duty units weigh less, they are more economical to install, and long-term maintenance is much easier. The overall cost of a Custom-Built Unit or a Semi-Custom Station Unit is dramatically higher and not needed in most installations. Please visit Capital Coil’s Belt Drive Product Page for additional descriptions of our units.

Shipping Schedules

  • Standard lead time: (6) weeks
  • (4) week quick-ship: 30% adder
  • (2) day quick-ship: 40% adder

Capital Coil is 100% transparent on all prices and pricing options. Each option is clearly listed on all quotes to help make your buying experience that much easier.

The Air Handler industry is pretty easy to understand when boiled down. If your job allows you to stay within “Production” type units that are built to normal standards without any customizations, you can save a lot on your price. The proper units for your project are still of the highest-grade quality, but they are much more of a fit for commercial, light-duty jobs.

Capital Coil & Air looks forward to working with you on all of your future Air Handler projects. You’ll be glad you did.